Santa Monica Pier sign begins restoration on 20 October
Published on 10/21/2026 at 17:37 | Editorial responsibility: Rafael Müller, Editor-in-Chief AD HOC NEWSRestoration changes at the entrance
- YESCO begins dismantling the entrance sign on 20 October 2026 for restoration in Las Vegas.
- A half-scale replica near Pier Burger preserves the familiar photo location while the original sign is away.
- The blue neon sign has welcomed visitors since 1941 and is listed on the California Register of Historical Resources.
- The replacement bridge is scheduled for completion in 2028, with a wider pedestrian walkway planned.
Santa Monica Pier begins a major restoration change on 20 October 2026, when its entrance sign is removed for specialist work in Las Vegas. The temporary change affects the best-known approach to the pier, but visitors can still reach the attractions and see a half-scale replacement near Pier Burger.
Santa Monica Pier sign leaves for restoration on 20 October
The City of Santa Monica announced that the blue neon sign would be dismantled in sections from Tuesday, 20 October. YESCO, a company specialising in neon displays, is leading the restoration as part of the Pier Bridge Replacement Project. The work includes repairing the neon tubing, removing rust, repainting the structure and completing structural repairs.
The city set out a sequence for the work. Neon removal and equipment preparation are scheduled for 20 October, the upper crown for 21 October and the main sign for 22 October. The sign is expected to travel to YESCO's facility in Las Vegas on 26 October. The city restoration schedule also says one lane of Ocean Avenue near the entrance will close during the work.
The removal is temporary. Once the replacement bridge is complete, the restored sign is planned to return at a slightly higher elevation, improving visibility and providing more clearance below it. The Santa Monica Daily Press reports that the original sign will be refurbished rather than replaced and will remain in secure storage during construction. The local report on the restoration also describes the temporary replica placed on the pier.
The 1941 sign and the bridge project
The entrance sign has welcomed visitors since 1941 and is listed on the California Register of Historical Resources. Its restoration is therefore connected to the history of the place, not simply to routine construction. While the original is away, the replica keeps a recognisable sign element at the entrance without presenting it as the historic structure.
The bridge beneath the entrance was originally built in 1939 and is being replaced because it no longer meets modern structural or seismic standards. The planned new structure includes a 15-foot-wide pedestrian walkway, according to the Santa Monica Daily Press. Completion is scheduled for 2028, in time for the Olympic and Paralympic Games in Los Angeles.
The relationship between the sign and the bridge is especially direct: the restoration removes a historic feature now, while the rebuilt bridge determines where it will be installed next. That means the entrance will look different during a visit in late October and November 2026, even though the pier itself remains accessible.
Visiting Santa Monica Pier: what travellers from Western Europe should know
- The sign removal begins on 20 October 2026, with the crown planned for 21 October and the main sign for 22 October.
- The pier remains open during the restoration, including its restaurants, shops and attractions. The half-scale replica stands just before Pier Burger on the left when walking towards the pier.
- Vehicle access is available from Pacific Coast Highway. Local bus routes and the Metro E Line serve downtown Santa Monica, from which the pier can be reached on foot.
- One lane of Ocean Avenue near the entrance is closed during removal work, and construction-related pedestrian changes may occur beneath the bridge. Visitors should follow signs and directions from on-site staff.
- Entry requirements depend on your nationality; UK travellers can check the FCDO travel advice at gov.uk/foreign-travel-advice, Irish travellers the Department of Foreign Affairs at ireland.ie.
Searching for Santa Monica Pier on social platforms
These links open searches for Santa Monica Pier on each platform.
Frequently asked questions about Santa Monica Pier
When does the sign restoration begin at Santa Monica Pier?
The entrance sign removal begins on 20 October 2026, with the main sign scheduled for removal on 22 October 2026.
What has changed at Santa Monica Pier?
The original 1941 sign is away for restoration, while a half-scale replica stands near Pier Burger. The pier remains open.
Where is Santa Monica Pier and how do you get there?
It stands at the western end of Colorado Avenue in Santa Monica, California. Vehicle access remains available from Pacific Coast Highway, while buses and the Metro E Line serve the area.
