Astera Labs, US04626A1034

Astera Labs unveils Orion for up to 160 accelerators: stock pre-market at EUR 283.00

Published on 10/13/2026 at 08:23 | Editorial responsibility: Rafael Müller, Editor-in-Chief AD HOC NEWS

Astera Labs stock is at EUR 283.00 pre-market with Lang & Schwarz on October 13, 2026. The company announced Orion, a modular rack-scale design for up to 160 accelerators per pod.

Key points in brief

  • Astera Labs announced the Orion rack-scale reference architecture on October 12, 2026.
  • Orion is designed to connect up to 160 accelerators per pod.
  • The reference designs are expected to become available through partners beginning in Q1 2027.
Astera Labs, US04626A1034, Illustration mit AI erstellt.
Astera Labs, US04626A1034, Illustration mit AI erstellt.

Astera Labs announced its Orion rack-scale reference architecture on October 12, 2026, according to the company’s news release. At 8:20 a.m. CEST on October 13, 2026, the stock was at EUR 283.00 in pre-market trading at Lang & Schwarz.

Pre-market indication

Lang & Schwarz quoted Astera Labs at EUR 283.00 on October 13, 2026, at 8:20 a.m. CEST. The further course from the Xetra open at 9:00 a.m. CEST is shown by the continuously updated real-time quote of Astera Labs stock.

Orion architecture

Orion is a modular, production-grade reference design that allows customers to select their own GPUs and CPUs. Astera Labs said its standards-based scale-up fabric is engineered to connect up to 160 accelerators per pod. The architecture includes six reference designs spanning racks, compute trays, fabric trays, memory trays, link boards and compute boards, with integration into the company’s COSMOS Rack Manager and COSMOS Fabric Manager software. The company said the designs are on track for availability through OEM and ODM partners beginning in Q1 2027. These details are set out in the company announcement.

What matters today. Astera Labs is showcasing a powered Orion rack at the Open Compute Project Global Summit from October 12 through October 15, 2026, according to the release. Orion is designed to connect up to 160 accelerators per pod. Availability through OEM and ODM partners is targeted to begin in Q1 2027.

Market context: Market report S&P 500.

More news and analysis on Astera Labs stock

Disclaimer...

en | US04626A1034 | ASTERA LABS | boerse | 70310229 | bgmi