Vulcan Energy Prepares Second Lionheart Drill Site as Citigroup Discloses 7.76% Holding
Published on 11/27/2026 at 06:53 | Editorial boerse-global.deVulcan Energy has kicked off preparations at the Trappelberg to move a drilling rig to its second new Lionheart drill pad in the Landau region, with spudding to follow once the equipment is assembled, commissioned and tested. The groundwork sits alongside a broader push on the German geothermal and lithium front, where the company is simultaneously advancing civil works, exploration licensing and a shareholder base that now includes a 7.76% voting stake held by Citigroup.
The US bank reported the holding on 19 November, split between 7.25% of voting rights from shares and 0.51% attached to instruments. On the same day, VanEck ETF Trust disclosed that its own stake had fallen from 3.62% to 2.96%, crossing below the reporting threshold on 17 November. Vulcan's shares were down 0.7% on Tradegate, leaving them 3.9% above the previous day's 52-week low.
Civils underway at the commercial plant
At the commercial lithium extraction facility in Landau, early-stage construction is now in progress, covering foundations, concrete structures, access roads and drainage. Management says Lionheart remains on schedule and on budget, with first commercial production targeted for the second half of 2028.
Should investors sell immediately? Or is it worth buying Vulcan Energy?
Landau-Ost, the adjacent area, is covered by a five-year licence to explore for geothermal energy and lithium. Vulcan aims to publish an initial resource estimate for the zone in the first quarter of 2027 and will run a study to determine which development routes are viable — including a possible tie-in to Lionheart.
More wells planned at Eutzinger Strasse
Beyond the flagship project, Vulcan intends to sink up to three additional deep wells at its geothermal plant on Eutzinger Strasse, on top of a relief well that has already been approved. Drilling there is not expected to start before autumn 2027.
Further north, the company and BASF are planning seismic surveys in the Vorderpfalz region for summer 2027. The chemicals group is assessing whether geothermal heat can support lower-CO? steam generation at its Ludwigshafen site.
Ad
Vulcan Energy Stock: New Analysis - 27 November
Fresh Vulcan Energy information released. What's the impact for investors? Our latest independent report examines recent figures and market trends.
