VanEck Slips Below Disclosure Thresholds at Vulcan Energy as Landau Drilling Plans Multiply
Published on 11/24/2026 at 13:31 | Editorial boerse-global.deTwo separate voting-rights filings on Vulcan Energy surfaced yesterday, both tracing back to the same 17 November date and both pointing the same direction: down. Van Eck Associates Corporation cut its stake from 5.04% to 4.94%, taking it under the 5% reporting line, while the VanEck ETF Trust trimmed its holding from 3.62% to 2.96%, dropping it beneath the 3% threshold.
The retreat by the index-fund arm comes as Vulcan keeps expanding the physical footprint of its business on several fronts at once.
Civils Underway at Lionheart
At the site of the commercial lithium extraction plant for the Lionheart project in Landau, the company has started construction work. The scope covers foundations, concrete works, access roads and site drainage. According to Vulcan, Lionheart remains on schedule and on budget, with commercial production targeted for the second half of 2028.
Should investors sell immediately? Or is it worth buying Vulcan Energy?
Landau Grows in Several Directions
Directly adjoining Lionheart, Vulcan has secured a five-year surface licence to explore for geothermal heat and lithium in the Landau-Ost area. Subsurface data is already being evaluated, and the company is aiming for an initial lithium resource estimate in the first quarter of 2027. After that, it intends to examine how the area could be tied into Lionheart — one of several development options under review.
The same neighbourhood is set for heavier equipment. On 11 November, Vulcan announced an expansion of its geothermal site on Eutzinger Strasse in Landau. Alongside a third well that has already been approved, the company plans up to three additional deep wells to lift capacity for both heat and lithium. Drilling is not expected before autumn 2027 at the earliest.
Seismic Work Ahead of Possible BASF Link
Further north, Vulcan and BASF disclosed on 18 November that the geothermal specialist intends to run 3D seismic surveys in the Vorderpfalz region in summer 2027. BASF is assessing whether geothermal heat could contribute to CO?-free steam generation at its Ludwigshafen site. The surveys are exploration work only; the locations of any future wells or plants remain open.
Taken together, the programme sketches a widening map: construction in Landau, exploration at Landau-Ost, extra wells on Eutzinger Strasse and seismic testing near Ludwigshafen — with first lithium numbers from the new licence area pencilled in for early 2027 and drilling rigs not due until later that year.
Ad
Vulcan Energy Stock: New Analysis - 24 November
Fresh Vulcan Energy information released. What's the impact for investors? Our latest independent report examines recent figures and market trends.
