Li-FT Power Ties US$1.4 Million Marketing Spend to Adina's Early-2027 Revaluation
Published on 11/18/2026 at 03:51 | Editorial boerse-global.deLi-FT Power has put a price tag and a payment calendar on its online marketing arrangement with i2i Marketing Group, disclosing on Monday that the contract carries a total budget of US$1.4 million and runs through March 1, 2027.
The outlay will be drawn down in instalments rather than paid up front. Each tranche is US$250,000, with the first due at contract signing and a second falling on October 9. Further payments follow every two weeks until November 20, and a final US$150,000 instalment is scheduled for December 15. The disclosure settles both the overall size of the marketing commitment and the schedule on which it becomes payable.
The marketing update landed alongside assay results from eleven holes at the company's Adina lithium project in Québec — figures that investors will ultimately judge not on headline grades alone but on how they feed into the project's next formal valuation.
Grades From Galinée and Footwall
At Galinée, one interval spanning 45 metres of drill core returned an average lithium oxide grade of 2.71%. A second Galinée interval came in at 2.71% over 25 metres, while a third section graded 3.14%. The release therefore contains several mineralised intervals rather than a single highlight.
Should investors sell immediately? Or is it worth buying Li-FT Power?
Results extended beyond Galinée as well: at Footwall, 26 metres of core averaged 1.86% lithium oxide.
One caveat matters for interpretation. Li-FT Power reports drill lengths, not true widths, and the actual thickness of the mineralised bodies remains unknown. Strong grades do not resolve that geometric question on their own.
A Larger Dataset Behind the Numbers
The 2026 programme comprised 39 holes totalling 11,420.5 metres. Li-FT Power also had previously drilled geotechnical holes assayed for lithium, broadening the data pool — though these supplementary analyses should be distinguished from freshly executed drilling. Not every hole examined was sunk with spodumene mineralisation in mind: two of the reported holes served geotechnical purposes.
All told, 45 holes covering 13,403.5 metres were processed. The published intervals rest on a nominal cut-off grade of 0.5% lithium oxide, with minimum-length and internal-dilution rules also applied — selection criteria that belong in any reading of the results.
Li-FT Power at a turning point? This analysis reveals what investors need to know now.
What Comes Next
The summer assays are slated to feed into an updated resource estimate and a preliminary economic assessment, both of which the company is targeting for early 2027. Neither study has been completed, and the drilling data represent an additional building block rather than proof of economic viability.
For shareholders, the decisive path runs from individual intervals to the resource estimate and then to the preliminary economic review. The stock rose 9.7% on Monday, closing at €0.7940.
Ad
Li-FT Power Stock: New Analysis - 18 November
Fresh Li-FT Power information released. What's the impact for investors? Our latest independent report examines recent figures and market trends.
