Global Uranium and Forum Energy Metals Announce the commencement of camp construction and planned geophysical surveys at the Northwest Athabasca Project, Saskatchewan
11.02.2025 - 14:00:12 | dgap.de| Global Uranium Corp. / Key word(s): Study 11.02.2025 / 14:00 CET/CEST The issuer is solely responsible for the content of this announcement. A combined ground EM and Resistivity survey will begin in early March on the Spring Bay target February 11, 2025 Calgary, Alberta — Global Uranium Corp. (CSE: GURN | OTC: GURFF | FRA: Q3J) (the “Company”) and Forum Energy Metals Corp. (TSX.V: FMC; OTCQB: FDCFF) (“Forum”) are pleased to announce that camp construction on the Northwest Athabasca Project has been initiated. In addition, plans are underway to conduct a Time Domain Electromagnetic Survey (TDEM) and Direct Current Resistivity and Induced Polarization (DCIP) Survey on its Spring Bay target located along the northwest shore of Lake Athabasca in Saskatchewan, Canada (Figures 1, 2). Geophysical work is expected to commence in March. Global has an option to earn 51% interest in Forum’s interest in the NWA Project by spending up to $9M over four years (see News Release dated May 30, 2024). Forum is the Operator of the Northwest Athabasca Project. "The integration of historical geophysical datasets and legacy drill results gives us an advantage in identifying areas of high potential," stated Ungad Chadda, CEO of Global Uranium. "We are pleased that the Forum exploration team’s knowledge and experience in Saskatchewan unconformity-style uranium deposits will shape the refined targeting strategy at the NWA Project, positioning us to unlock the site’s full value potential." Rick Mazur, CEO of Forum Energy Metals stated, “Forum is excited to be building a camp and working again on the Northwest Athabasca Project. Refinement of the drill targeting is key to success and the TDEM and DCIP surveys will improve drill target precision of the prospective Spring Bay area.” Camp Construction and Winter Geophysical Surveys A 20-person camp is planned on the west side of Maurice Bay on the Northwest Athabasca Project (Figure 2). The camp materials will be mobilized to site via a combination of fixed-wing aircraft on skis as well as by ice road from Uranium City. Currently camp and drilling equipment and materials are being shipped and staged in Fond du Lac and Uranium City. The Spring Bay target hosts a 4 km long, strong gravity low anomaly, which is coincident with historical drill holes that have intersected elevated uranium and anomalous clay alteration. To refine drill targeting, new ground electromagnetic and resistivity surveys are proposed. A small moving loop TDEM survey is planned to help refine and understand the orientation and strength of the conductors in the area. A larger DCIP survey is planned to provide resistivity and chargeability data over the Spring Bay target, which will help identify clay alteration systems at depth. Both the TDEM and DCIP surveys will be used to refine targeting within the large Spring Bay gravity low anomaly. 11.02.2025 CET/CEST Dissemination of a Corporate News, transmitted by EQS News - a service of EQS Group. The issuer is solely responsible for the content of this announcement. The EQS Distribution Services include Regulatory Announcements, Financial/Corporate News and Press Releases. Archive at www.eqs-news.com |
| Language: | English |
| Company: | Global Uranium Corp. |
| 1309 7th Street SW | |
| T2R 1A5 Calgary | |
| Germany | |
| Internet: | globaluranium.com |
| ISIN: | CA37962L1013 |
| EQS News ID: | 2083941 |
| End of News | EQS News Service |
| |
Hol dir jetzt den Wissensvorsprung der Aktien-Profis.
Seit 2005 liefert der Börsenbrief trading-notes verlässliche Aktien-Empfehlungen - Dreimal die Woche, direkt ins Postfach. 100% kostenlos. 100% Expertenwissen. Trage einfach deine E-Mail Adresse ein und verpasse ab heute keine Top-Chance mehr. Jetzt abonnieren.
Für. Immer. Kostenlos.
Für. Immer. Kostenlos.
CA37962L1013 | GLOBAL URANIUM CORP. | boerse | 66633899 |

